久草在线成人,91一级黄色视频,亚洲综合性爱AV,欧美卡一卡二,91性爱视频网站

Your present position:Home >> Use and Maintenance of Air-jet Loom
Use and Maintenance of Air-jet Loom
Time:[2019-8-7]    Pageview:9246

Use and maintenance of air-jet looms:

I. Periodic Maintenance

1.Daily maintenance and handling

Maintenance workers need to carry out routine maintenance of electric oil pump, centralized oil supply, heat dissipation part of main motor, input shaft of open cam box, electromagnetic brake, weft detector, scissors, winch, side brace and edge-trapping yarn.

2.Maintenance and disposal of machine time

Check whether the side brace ring rotates flexibly, whether it is worn, whether there are flying flowers, whether the interval between stop pin and main drum is 0.5 mm, whether the air pipe leaks, whether the centralized oil supply leaks, whether the oil pipe is damaged or bent, whether there are flying flowers in the control box, confirm whether the height error of the heald frame is less than 2 mm, and whether the air filter exhausts. Whether the pipe is unblocked, whether there are flying flowers on the pinion of the warp shaft, whether there is yarn head on the bevel gear shaft of the opening device, whether the screen hole on the oil filter is blocked, whether yarn head is rolled on the warp let-off and loosening axles, whether there is damage to the insulating sleeve of the wire and whether the clearance of the brake is correct. Fuel the nozzle, the gear face and chain of the open gear, and check whether the heald frame and the guide plate of the heald frame are worn or not.

3.Half-yearly overhaul and treatment

It is necessary to check whether the winding is clean, whether there are yarn marks and scars on the main drum and pin drum, whether the inside of the stop pin assembly is dirty, whether the open wire rope is elongated or damaged, whether the recovery spring is damaged, and whether the bearing of the open wire rope connecting seat is worn. Whether the belt tension is appropriate or not, whether there is damage, whether the sensors are working properly, whether the transmission gear box, coiling gear box and sending gear box are replaced with lubricating oil, whether the filter sieve is blocked, whether the reed is stained with dirt, whether the wind speed value is normal, and whether the U-shaped shaft lining of the pull-down hook is normal. Whether the wear is less than 2 mm, whether the main nozzle duct is bent, whether the coiling roller chain is elongated, whether the clearance between planetary gears is normal, whether the wear of the axle lining of the planetary tube seat is less than O.5 mm, whether the wear of the axle lining of the planetary tube is less than 0.5 mm, whether the wear of the axle lining of the planetary tube is less than O.5 mm, whether the auxiliary nozzle is scratched or not. There are yarn marks, whether bending or not, whether there is oil in the scissors device, and so on.

4.One-year overhaul and disposal

Whether the screw of the support foot of the main nozzle is loose or not, the screw should be tightened again.

5.Overhaul and disposal in two years

Whether the winding roll, pressing roll and rough rubber are worn, whether the warp and warp parts of the warp axle are worn within 0.3 mm, whether the buffer performance is reduced, whether the nylon bushing and the guide pin column of the buffer are worn, whether the auxiliary nozzle is dirty, whether the weft is cut correctly by the side shearing device of the yarn supply, whether the stop pin hole of the stop pin assembly is worn or not. Whether the wear of the roll shaft of the coiling cloth is less than 0.5 mm or not is less than 0.5 mm.

6.Overhaul and disposal in three years

Whether the lubricating oil of solenoid valve is insufficient and whether the coiling cloth roll rotates flexibly.

7.Seven-year overhaul

It includes the maintenance of bearings, oil seals, gears, cams, axle linings, stop pins, main motors, frame, opening, warp feeding, winding and weft storage parts.

二、Contents and Notices to be Preserved by Loom Institutions after Long-term Use

(1)Main transmission part: After long-term use of the loom, it is necessary to replace the oil seal of the crankshaft bearing seat of the driving part.

(2)Opening part: It is necessary to replace the cam open arm bearing, wire rope, heald spring and heald arm bearing.

(3)Replacement of synchronous toothed belt and cleaning of oil filter.

(4)Clean reed regularly.

(5)The inner parts of the length measuring and weft storage drum are replaced, the inner parts of the stop pin are replaced, and the encoder is cleaned.

(6)Main nozzle cleaning, filter cleaning, cleaning and repair of solenoid valve and pressure regulating valve, inspection and configuration of gas pipe.

(7)Servo motor maintenance and replacement, buffer repair and internal parts replacement.

(8)Check coiling brake rollers, chains, tensioning wheels, adjusting pins and replacement, maintenance and replacement of friction discs and discs. Inspection and replacement of rough rubber.

(9)Check and replace planetary gear, tube bearing, guide arm shaft and coupling.

(10)Inspection and replacement of weft detection cable

Previous: 暂无

Next: 喷气织机:卖点在于低耗

在线A片视频导航| 久热婷婷五月天| 亚洲性爱p| 第四色AV| 亚洲 主播 无码 自拍| 日本黄m高清| 日韩av黄色片| 久久手机观看AV| 亚洲一区二区高清无码| 亚洲婷婷五月中文字幕| 国产在线视频网址| 黄色片承认| 日韩三级A片视频| 高清AV无码电影| 黄色网片A1| 99玖玖资源网| 黄色一级a片网站| a在线v视频| 一级内射片在线网站观看| 高清无码成人网1| 亚洲无码电影av| 69AV视频电影| 欧美成人五级A片| 无码专区A级毛片| 农村一级婬片A片| 亚州日韩av| 夜色资源网| 色色五月天av| 国产在线小视频| 亚洲AV黄色一级电影| 成人AV电影在线观看| 91东热激情| av在线视| 狼友一二| 色猫成人网| 这里只有精品AV| 日韩精在线| 久久一级片| 中文字幕A片中文伦| 超碰av自拍| 2019年成人一级片|